Concrete footings have been poured… |
bill o. |
…and ground prepared for pouring the concrete
slab. Friday December
19th, 2003 |
||||||||||
|
Monday, December 22nd 2003,
approximately 8:30AM Loading
a “Georgia Buggy”…
|
bob p. |
|
||||||||||
|
… and depositing the first load in the Northwest
corner… |
bob p. |
|||||||||||
|
Creating a smooth, flat
surface…
|
bob p. |
|||||||||||
|
|
bill o. |
|
||||||||||
|
Eight mixer loads of concrete would be poured during the day. |
bob p. |
Inserting lugs for bolting wall frame to concrete
slab. . .
|
||||||||||
|
Slab has been poured… |
bob p. |
|
||||||||||
|
Approx. 5:00 PM, Dec. 22nd… Finishing touches by the master craftsman. |
bob p. |
|||||||||||
Photo credits: Bill
O’Connor, Bob Passmore.